Synthesys

Blog · Explainer

Multi-project wafers, the cheapest route to first silicon

How MPW shuttles share a reticle between many designs, who still runs them after the Efabless closure, and what a seat costs next to a full mask set, with published 2026 prices.

  1. What an MPW is
  2. Who runs shuttles
  3. Seat and mask costs
  4. Timeline and dies
  5. MPW vs MLR vs full set
  6. Limits
  7. Common questions
9 min read 14 sources, linked below

Part 01

A multi-project wafer splits one mask set between many designs.

A multi-project wafer (MPW), also called a shuttle, is a fabrication run in which several unrelated chip designs are placed side by side on the same reticle. One mask set is made, the wafers are processed once, and each customer pays for the slice of silicon area its design occupies rather than for the whole set of masks.

The point is to cut the fixed, up-front cost of a first tape-out. TSMC says its CyberShuttle programme “significantly reduces non-recurring engineering (NRE) costs” and cuts prototyping cost by “up to 90%”.1 Europractice, the European aggregator, names MPW runs and multi-layer masks as the two techniques it uses to bring prototyping costs down.2

Mechanically, the shuttle operator collects finished layouts by a fixed deadline, checks them against the design rules, tiles them into a single reticle field with scribe lines between them, and sends the merged data to the foundry. After fabrication the wafers are diced and each participant receives its own dies. If you are new to how masks and lots work, the Academy lesson on masks and lots covers the background.

The trade is simple: you get real silicon on a production process for a fraction of the price of your own masks, but you accept the operator’s schedule, area rules and sample count.

Part 02

Who runs shuttles, and which ones are still operating.

Shuttles come from two kinds of organisation: foundries running their own programmes, and aggregators that buy space on foundry runs and resell it in smaller pieces with design support attached.

TSMC CyberShuttle has run since 1998, covers processes from 0.5µm to A14 and lists “up to 10 shuttles per month”.1 Europractice publishes full schedules and price lists for runs at ams OSRAM, GlobalFoundries, IHP, STMicroelectronics, TSMC, UMC, X-FAB and others, which makes it one of the few public sources of shuttle pricing.3 GlobalFoundries GlobalShuttle spans 12nm to 180nm plus RF, SOI, GaN and silicon photonics platforms; GF says a shuttle month is confirmed only “once minimum demand is fulfilled”.4

IHP runs 130nm SiGe BiCMOS shuttles sold through Europractice, including low-cost runs for designs on its open-source PDK.3 MOSIS, launched by USC’s Information Sciences Institute in 1981, has been relaunched as MOSIS 2.0, which began accepting external customers in summer 2024 and continues to offer MPW services.5

The open-source route changed in 2025. Google sponsored free shuttles on SkyWater’s 130nm process from 2020, run by Efabless, with 40 design slots per run.6 Efabless shut down “until further notice” in early 2025, which stranded projects in flight.7 Cadence and SkyWater then launched a SKY130 aggregation service with an inaugural run at the end of May 2025.8 The chipIgnite name now appears on ChipFoundry’s site, operated by UmbraLogic Technologies, with shuttles scheduled into 2027.9 Tiny Tapeout, which sells small tiles on shared chips, survived as an independent company and moved part of its programme to IHP.7

Selected MPW providers as of November 2026. Prices are published list prices; sources in the text.
ProviderProcessesPublished entry priceSamples returnedStatus
TSMC CyberShuttle0.5µm to A14Not published by TSMC; via Europractice from EUR 4,491 (65nm, 1 mm²)Not statedOperating
GlobalFoundries GlobalShuttle12nm to 180nm, RF, SOI, GaN, photonicsVia Europractice, e.g. EUR 17,820/mm² (22nm FDSOI)Up to 100 dieOperating
Europractice (IHP SG13G2)130nm SiGe BiCMOSEUR 7,300/mm², 0.8 mm² minimum40 dicedOperating
Cadence / SkyWaterSKY130USD 10,000–12,000 per design40 bare die (2025 run)Operating
ChipFoundry chipIgniteSkyWater 130nmUSD 14,950 per tape-out100 QFN-packaged or bare dieOperating
MOSIS 2.0Network of university and defence fabsNot publishedNot statedRelaunched 2024
Efabless / Google Open MPWSKY130Free to selected open designs–Closed 2025

Part 03

What a seat costs, and what a full mask set costs.

MPW pricing is almost always area times a rate, with a minimum. Europractice’s 2026 list makes the spread across nodes plain. Mature 0.35µm CMOS from ams OSRAM (C35B4C3) is EUR 640 per mm² with a 10 mm² minimum, so the smallest order is about EUR 6,400.3 X-FAB’s 0.18µm XH018 is EUR 1,314 per mm², and Europractice gives 10 mm² of its basic offering as EUR 13,140.3

Advanced nodes cost far more per square millimetre. GlobalFoundries 22nm FDSOI is EUR 17,820 per mm² at standard rates with a minimum equivalent to 4 mm², which puts the smallest seat at roughly EUR 71,000.3 TSMC’s small-area “mini@sic” runs through Europractice start at EUR 4,491 for 1 mm² of 65nm, EUR 10,609 for 1 mm² of 28nm and EUR 30,592 for 1 mm² of 16nm FinFET.3 These are standard prices; Europractice also lists lower discounted prices for eligible customers.

At the bottom of the market, the Cadence SKY130 service charged USD 10,000 per design for its 2025 run, and USD 10,000–12,000 for the run that closed in January 2026.810 ChipFoundry lists USD 14,950 per tape-out for up to 15 mm² of die space with a pre-built RISC-V SoC around your design.9

Compare that with owning the masks. IC Knowledge’s 2020 cost model put a full logic mask set at about $43K at 250nm, $165K at 90nm, $1.2M at 28nm and $10.5M at 7nm.11 Public figures for 5nm and 3nm mask sets vary widely between secondary sources, so we have left them out; the direction, steeply upward with each node, is not in doubt.

Full mask set, 28nm (2020)
$1.2M11
Full mask set, 7nm (2020)
$10.5M11
TSMC 28nm seat, 1 mm² (2026)
EUR 10,6093
SKY130 seat (2025)
USD 10,0008

The same IC Knowledge model shows why masks matter beyond the first lot: at 7nm, running only 100 wafers on a mask set made each wafer about 18 times as expensive as running 100,000, against about 5 times at 28nm.11 That amortisation problem is exactly what a shuttle sidesteps.

Part 04

Timeline: plan for roughly half a year from tape-out to dies.

The schedule starts before the layout is finished. Europractice asks for TSMC mini@sic design registration at least 3 months in advance and warns that several TSMC shuttles are “extremely loaded”.3 For IHP runs, the final GDSII is due within 14 calendar days of registration.3 GlobalFoundries has cut its reservation deadline to 35 days before tape-out.4

Published examples of submission-to-delivery times fall between about four and eight months. The first Cadence SKY130 run took submissions in mid-May 2025 with die delivery expected in September 2025; the next closed on 16 January 2026 with delivery expected in July 2026.810 ChipFoundry’s CI2612 shuttle tapes out on 7 December 2026 with delivery listed for 25 May 2027.9 Tiny Tapeout’s IHP 25b shuttle closed on 1 September 2025 with chips expected in May 2026.12

What comes back is a small bag of dies, usually bare. IHP shuttles deliver 40 diced samples by default; X-FAB runs include 50 dies, with up to 50 more at EUR 25 each.3 GlobalShuttle offers up to 100 die as part of the base fee.4 The Cadence SKY130 service gave each participant 40 bare die.8

Packaging is normally your problem. Europractice says it “usually delivers unpackeged and untested prototypes” but can arrange packaging on request, and bumping is available for TSMC 12-inch technologies.23 Cadence pointed participants to third-party packaging houses.10 ChipFoundry is the exception among low-cost services, offering 100 QFN-packaged parts or bare die.9 Budget for a package, a test board and bring-up time; the Academy lesson on packaging explains the options.

Part 05

MPW, multi-layer reticle or a full mask set.

There are three ways to get a design onto wafers, and they trade mask cost against wafer cost and control.

A full mask set gives each layer its own reticle, dedicated to your design. It has the highest one-off cost but the lowest cost per wafer, and it is the only sensible choice for volume production.13

A multi-layer reticle (MLR, which TSMC calls multi-layer mask or MLM) puts several layers of your own design on one physical reticle. When TSMC announced the service in 2008 it said four layers per reticle gave the best cost-to-performance ratio, and that customers paid only for reticles actually made.14 The catch is that the scanner exposes a smaller field per layer, which slows production, so mask cost falls but wafer price rises.13 MLR suits a dedicated engineering lot or a low-volume product.

An MPW shares the reticle with other companies. It is the cheapest way to first silicon, but you get a fixed number of dies, no say in the schedule and no control over process splits.

How the three routes compare. Qualitative summary drawn from sources 2, 13 and 14.
RouteMask cost to youWafer costVolumeSchedule controlBest for
MPW / shuttleShare of one set, by areaIncluded in seatTens of diesOperator’s calendarFirst silicon, test chips, IP validation
Multi-layer reticleLower than full setHigher than full setEngineering lots, low volumeYour own lotPre-production, small products
Full mask setHighestLowestProductionYour own lotsVolume manufacturing

Many teams use all three in sequence: a shuttle to prove the circuits, an MLR lot to qualify the product, then full masks once orders justify them. The Academy lesson on tape-out covers what has to be signed off before any of them.

Part 06

The limits founders run into.

Die area is capped or penalised. The Cadence SKY130 service requires layouts to fit a 3.588mm × 5.188mm bounding box.8 On per-area runs the minimum charge works the other way: on GF 22nm FDSOI you pay for 4 mm² even if your test chip is smaller.3 Large dies rarely suit a shuttle, so teams building big chips usually test individual blocks first.

Sample counts are small. Forty to a hundred dies is enough to characterise circuits and demonstrate a product to investors. It is not enough for reliability qualification or meaningful yield statistics, and extra dies are often limited; X-FAB caps additional purchases at 50.3 For why small samples say little about yield, see our post on chip yield.

The calendar is fixed and can move. A missed deadline means waiting for the next run. GlobalFoundries confirms shuttle months only when enough demand arrives, and SkyWater’s delivery dates were quoted as subject to its fabrication timeline.410 Europractice also requires export-control information at registration.3

Aggregators can disappear. The Efabless closure left Tiny Tapeout unsure whether two shuttles’ worth of chips would ever ship and paused its SkyWater runs.7 Check an aggregator’s track record and what happens to your design if a run is cancelled before paying.

Process options are standard only. You get the foundry’s baseline flow and whatever optional modules the run offers; skewed corner lots and custom process changes need a dedicated lot.

Part 07

Common questions.

What is a multi-project wafer?

A multi-project wafer, or shuttle, is a fabrication run where many different chip designs share one reticle and one mask set. Each participant pays for the area its design uses and receives a small number of dies, which makes first silicon affordable for startups, universities and IP developers.

How much does an MPW shuttle cost?

It depends on node and area. Europractice’s 2026 list runs from EUR 640 per mm² for 0.35µm CMOS to EUR 17,820 per mm² for GlobalFoundries 22nm FDSOI, and 1 mm² of TSMC 16nm costs EUR 30,592. Open-source-friendly SKY130 shuttles cost USD 10,000–15,000 per design.

How long does a tape-out on a shuttle take?

Recent published schedules show roughly four to eight months from submission to delivered dies, plus registration lead times of weeks to three months beforehand. Packaging and bring-up add more time after the dies arrive.

How much does a full mask set cost?

IC Knowledge’s 2020 model put a logic mask set at about $1.2M at 28nm and $10.5M at 7nm, with leading-edge nodes higher still. That is why most first chips go on a shuttle before a company commits to its own masks.

Next

Keep reading.

Synthesys is building a manufacturing line for frontier compute: fabrication, advanced packaging and test on one line, with every wafer traced. If you are planning silicon and want to talk it through with an engineer, we would like to hear from you.

Talk to us

Sources

Where the figures come from.

  1. TSMC “CyberShuttle Prototyping Service” (2026). tsmc.com
  2. Europractice “MPW Prototyping” (2026). europractice-ic.com
  3. Europractice “Schedules & Prices 2026 (General MPW and mini@sic)” (2026). europractice-ic.com
  4. GlobalFoundries “Multi-Project Wafer Program (GlobalShuttle)” (2026). gf.com
  5. USC Information Sciences Institute “MOSIS 2.0's First Year” (2025-02-21). isi.edu
  6. Design & Reuse “Google Partners with SkyWater and Efabless to Enable Open Source Manufacturing of Custom ASICs” (2020-11-12). us.design-reuse.com
  7. Tiny Tapeout “Efabless shuts down - Tiny Tapeout will continue” (2025-03-01). tinytapeout.com
  8. SkyWater Technology “Lowering Barriers to Silicon: Cadence Launches MPW Aggregation Service for SKY130” (2025-05-05). skywatertechnology.com
  9. ChipFoundry (UmbraLogic Technologies) “chipIgnite” (2026). chipfoundry.io
  10. Design & Reuse (Cadence blog) “Next Steps for the Cadence and SkyWater MPW Service” (2025-10-16). design-reuse.com
  11. Scotten W. Jones, IC Knowledge LLC (via SemiWiki) “Economics in the 3D Era (Lithovision 2020)” (2020-03). semiwiki.com
  12. Tiny Tapeout “Tiny Tapeout IHP 25b” (2025). tinytapeout.com
  13. AnySilicon “Understanding Maskset Type: MPW, MLM, MLR, Single Maskset” (n.d.). anysilicon.com
  14. Electronic Design “TSMC Announces Multi-Layer Mask Service” (2008-01-02). electronicdesign.com